Case Study: Cully Boulevard Green Street Project
-
2021-01-01
Details:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The City of Portland used $1.2 million of Transportation System Development Charges (TSDC) to rebuild a portion of NE Cully Blvd. with significant safety improvements, including new sidewalks, cycle tracks, and planting strips for pedestrian and bicycle safety. Estimating the impacts of development on infrastructure costs based on person trips, rather than the more common method using vehicle trips, allows the City to more accurately anticipate future infrastructure costs across a vibrant multi-modal transportation network that integrates transit, pedestrian, cycling, and vehicle trips.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: