DeGeorge, M., & Gorhum, T. (2022). F40 CEM Locomotive and M1 Passenger Car Impact Test (Report No. DOT/FRA/ORD-22/24). United States. Department of Transportation. Federal Railroad Administration. https://rosap.ntl.bts.gov/view/dot/62494
DeGeorge, Matthew and Travis Gorhum. F40 CEM Locomotive and M1 Passenger Car Impact Test. Report no. DOT/FRA/ORD-22/24. United States. Department of Transportation. Federal Railroad Administration, 2022. https://rosap.ntl.bts.gov/view/dot/62494.
DeGeorge, Matthew, and Travis Gorhum F40 CEM Locomotive and M1 Passenger Car Impact Test. United States. Department of Transportation. Federal Railroad Administration, 2022, Report no. DOT/FRA/ORD-22/24, ROSA P. https://rosap.ntl.bts.gov/view/dot/62494.
An impact test with a F40 locomotive and a M1 passenger car was conducted to evaluate the performance of the vehicles under dynamic conditions. The locomotive was retrofitted with crash energy management (CEM) components – including a push-back coupler (PBC), deformable anti-climbers, and a sliding lug connected to the draft pocket with a set of shear bolts. The impact test was performed in November 2021 at the Transportation Technology Center in Pueblo, Colorado. The M1 passenger car, backed by two empty hopper cars, was impacted by the CEM-equipped locomotive at 32.8 mph. The impact-initiated deformation on one set of anti-climbers, activated the PBC, and sheared all the shear bolts.
DeGeorge, M., & Gorhum, T. (2022). F40 CEM Locomotive and M1 Passenger Car Impact Test (Report No. DOT/FRA/ORD-22/24). United States. Department of Transportation. Federal Railroad Administration. https://rosap.ntl.bts.gov/view/dot/62494
DeGeorge, Matthew and Travis Gorhum. F40 CEM Locomotive and M1 Passenger Car Impact Test. Report no. DOT/FRA/ORD-22/24. United States. Department of Transportation. Federal Railroad Administration, 2022. https://rosap.ntl.bts.gov/view/dot/62494.
DeGeorge, Matthew, and Travis Gorhum F40 CEM Locomotive and M1 Passenger Car Impact Test. United States. Department of Transportation. Federal Railroad Administration, 2022, Report no. DOT/FRA/ORD-22/24, ROSA P. https://rosap.ntl.bts.gov/view/dot/62494.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.