Post-Retrofit Analysis of the Tuttle Creek Bridge [Summary]
-
2008-03-01
-
Details:
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The Tuttle Creek Bridge was built in 1962. Like many older welded steel bridges, it has developed fatigue cracks. The majority of cracks were forming in the upper web-gap region. In addition, fatigue cracking was occurring along gusset plates in the structure. A retrofit was performed in 1986 to prevent further fatigue cracking. Unfortunately, the cracks propagated after the retrofit. The purpose of this report is to present results of the post-retrofit test with data from the pre-retrofit test. Comparisons of stresses for each key area are included in the report. Details of the Tuttle Creek Bridge and testing procedure are provided.
-
Content Notes:Publication date is taken from the full report.
-