Withers, J., & Pate, S. (2021). Monitoring and Analysis of the Integrated Network (MAIN) Phase II Research Results [Research Results] (Report No. RR 21-14). United States. Department of Transportation. Federal Railroad Administration. https://rosap.ntl.bts.gov/view/dot/57151
Withers, Jared and Shad Pate. Monitoring and Analysis of the Integrated Network (MAIN) Phase II Research Results [Research Results]. Report no. RR 21-14. United States. Department of Transportation. Federal Railroad Administration, 2021. https://rosap.ntl.bts.gov/view/dot/57151.
Withers, Jared, and Shad Pate Monitoring and Analysis of the Integrated Network (MAIN) Phase II Research Results [Research Results]. United States. Department of Transportation. Federal Railroad Administration, 2021, Report no. RR 21-14, ROSA P. https://rosap.ntl.bts.gov/view/dot/57151.
A new web application tool called the Monitoring and Analysis of the Integrated Network-Core Data Exchange (MAIN-CDX) can support the monitoring and troubleshooting of Interoperable Train Control (ITC)-compliant Positive Train Control (PTC). The tool provides a standard method of requesting ITC-PTC asset data from other railroads, replying to requests received for asset data, and tracking request status through the use of a dashboard. Through the use of the user interface, MAIN-CDX provides railroads the capability to manually create requests for ITC-PTC asset data and manually respond to requests for data received.
Withers, J., & Pate, S. (2021). Monitoring and Analysis of the Integrated Network (MAIN) Phase II Research Results [Research Results] (Report No. RR 21-14). United States. Department of Transportation. Federal Railroad Administration. https://rosap.ntl.bts.gov/view/dot/57151
Withers, Jared and Shad Pate. Monitoring and Analysis of the Integrated Network (MAIN) Phase II Research Results [Research Results]. Report no. RR 21-14. United States. Department of Transportation. Federal Railroad Administration, 2021. https://rosap.ntl.bts.gov/view/dot/57151.
Withers, Jared, and Shad Pate Monitoring and Analysis of the Integrated Network (MAIN) Phase II Research Results [Research Results]. United States. Department of Transportation. Federal Railroad Administration, 2021, Report no. RR 21-14, ROSA P. https://rosap.ntl.bts.gov/view/dot/57151.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.