Phase 1 User Needs Identification and Requirements Plan (UNIRP)- Atlanta Regional Commission ITS4US Deployment Project
-
2021-04-12
-
-
Series: ITS4US Phase 1
Details:
-
Creators:
-
Corporate Creators:
-
Contributors:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Series:
-
DOI:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report (Jan 2021-Feb 2022)
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:The Atlanta Regional Commission Complete Trip – ITS4US Deployment project, Safe Trips in a Connected Transportation Network (ST-CTN), is leveraging innovative solutions, existing deployments, and collaboration to make a positive impact using transportation technology to support safety, mobility, sustainability, and accessibility. The ST-CTN concept is comprised of an integrated set of advanced transportation technology solutions (connected vehicle, transit signal priority, machine learning, predictive analytics) to support safe and complete trips, with a focus on accessibility for those with disabilities, aging adults, and those with limited English proficiency. The User Needs Identification and Requirements Planning (UNIRP) defines the processes that will be used to generate, coordinate, approve, and support the configuration control of user needs and system requirements. The user needs and requirements development processes are critical processes that must occur early in the project lifecycle, likely before any decisions about design and development processes are made.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: