Need for Innovation: Bridge engineers are seeking new ways to build better bridges, reduce work zone travel delays, and improve repair techniques thereby reducing maintenance. Additionally, owners are challenged with replacing critical bridge components (particularly bridge decks) during limited or overnight road closure periods. Precast panels manufactured from UHPC can provide signi?cant durability improvements to bridge decks due to the high strength, extremely low permeability, and improved connection details inherent in the system. The use of this innovation will result in reduced construction time for new and rehabilitated bridges, the ability to upgrade the load-carrying capacity of existing bridges, and improved durability of bridge decks
Partial-depth precast concrete deck panels (PDDPs) are relatively thin precast prestressed concrete panels that span between girders which combine to ...
Using accelerated construction methods, a prestressed, precast bridge, was constructed the by Iowa DOT. The design concept involved the use of precast...
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.