Destructive Testing of IDOT Bridge Structure Number 020-3087
-
2020-08-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
DOI:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report 11/16/2019–8/15/2020
-
Corporate Publisher:
-
Abstract:The partial collapse of Illinois Department of Transportation structure 020-3087 on October 1, 2019, provided IDOT with the opportunity to evaluate the in situ strength of a precast, prestressed concrete deck beam bridge after 50 years in service. An undamaged beam was transported to the Newmark Structural Engineering Laboratory and tested in three-point bending to failure on February 25, 2020. The beam supported a peak load of 33.14 kips before failure, an ultimate moment of 227.5 kip-ft. Upon failure, the concrete around the prestressing strands was removed to expose the strands. All strands were present; however, the strands were in a different configuration than shown on design drawings. None of the strands showed visible corrosion.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:e3afab2847d733444533f3ae4f2b8040621e88dfc4ce46bf1e1ac9cacb58c3d7f1373a592b00a7414fe105530b70aa0752aed6c33f35458490c60defd99bd4b8
-
Download URL:
-
File Type: