National Fuel Cell Bus Program: Proterra HD 30 Fuel Cell Bus Demonstration
-
2020-09-01
-
Details:
-
Alternative Title:FTA National Fuel Cell Bus Program: Proterra HD 30 Fuel Cell Bus Demonstration Addendum 1
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
DOI:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Project Report, 2020
-
Corporate Publisher:
-
Abstract:This document is an addendum to the final report to the Federal Transit Administration (FTA) covering the project performance and results on the development, build, and demonstration of a next generation Proterra fuel cell hybrid bus. The bus was built using two Hydrogenics HD30 fuel cells and was demonstrated by Capital Metro in Austin, Texas. A second demonstration was planned for Flint, Michigan, but the program ended prior to the beginning of the scheduled demonstration period. By the end of the project, the bus was driven 5,788 miles over 84 service days. That work is reported in “FTA National Fuel Cell Bus Program: Proterra HD 30 Fuel Cell Bus Demonstration” (August 2017). This report covers the analyses of large-scale zero-emission bus fleet infrastructure costs conducted as part of this project and documents the coordination of communications and outreach work CTE conducted on behalf of FTA’s National Fuel Cell Bus Program (NFCBP) as part of this same grant. This is the final report for the bus development, build, and demonstration project and the outreach and education work.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: