0-6651 : Continuous Prestressed Concrete Girder Bridges, Project Summary
-
2014-01-01
Details:
-
Alternative Title:Continuous Prestressed Concrete Girder Bridges, Project Summary
-
Corporate Creators:
-
Contributors:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This project focused on developing additional economical design alternatives for longer-span bridges with main spans ranging from 150– 300 ft, using continuous precast, prestressed concrete bridge structures with in-span splices. What the Researchers Did During Phase 1 of the project, researchers evaluated the current state of the art and practice relevant to continuous precast, prestressed concrete girder bridges and recommended suitable continuity connection details for typical Texas bridge girders. During Phase 2 of the project, researchers developed detailed design examples, conducted a parametric design study, and tested a full-scale modified Tx70 girder specimen containing three splice connections. Based on the findings from Phases 1 and 2, design guidelines and recommendations were developed for in-span splice connection details for use in continuous precast, prestressed concrete girder bridges.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: