Trapping and Transportation of Adult and Juvenile Salmon in the Lower Umatilla River in Northeast Oregon, 19964997 – Umatilla River Basin Trap and Haul Program. Annual Progress Report, October 1996–September 1997
-
1997-09-01
Details:
-
Alternative Title:Trapping and Transportation of Adult and Juvenile Salmon in the Lower Umatilla River in Northeast Oregon, 1996–1997 – Umatilla River Basin Trap and Haul Program. Annual Progress Report, October 1996–September 1997
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Annual Progress Report
-
Corporate Publisher:
-
Abstract:Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were collected at Threemile Dam from August 30, 1996 to August 26, 1997. A total of 2,477 summer steelhead (Oncorhvnchus mykiss); 646 adult, 80 jack, and 606 subjack fall chinook (0. tshawytscha); 618 adult and 24 jack (0. kisutch); and 2,194 adult and four jack spring chinook (0. tshawvtscha) were collected. All fish were trapped at the east bank facility. Of the fish collected, 22 summer steelhead; 18 adult coho and two jack fall chinook: five adult and 407 adult and three jack spring chinook were hauled upstream from Threemile Dam. There were 2,245 summer steelhead; 70 adult, 51 jack and 520 subjack fall chinook: 593 adult and 24 jack coho and 1,130 adult spring chinook released at Threemile Dam. In addition, 110 summer steelhead; 551 adult and 25 jack fall chinook; and 600 adult spring chinook were collected for broodstock. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for out migrating juvenile salmonids and steelhead kelts. The canal was open for a total of 210 days between December 16, 1996 and July 30, 1997. During that period, fish were back to the river 175 days and were trapped on 35 days. An estimated 1,675 pounds of juvenile fish were transported from Westland to the Umatilla River boat ramp (RM 0.5). Approximately 80% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was operated from October 4 to November 1, 1996 and from March 26 to July 7, 1997. The juvenile trap was not operated this year.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: