Poivka, K. A., Sicking, R. K., Rohde, J. R., Reid, J. D., & Holloway, J. C. (2001). Guardrail and Guardrail Terminals Installed Over Curbs - Phase II (Report No. TRP-03-105-00). Federal Highway Administration (U.S.). https://rosap.ntl.bts.gov/view/dot/41762
Poivka, K. A., R. K. Sicking, J. R. Rohde, J. D. Reid, and J. C. Holloway. Guardrail and Guardrail Terminals Installed Over Curbs - Phase II. Report no. TRP-03-105-00. Federal Highway Administration (U.S.), 2001. https://rosap.ntl.bts.gov/view/dot/41762.
Poivka, K. A., et al. Guardrail and Guardrail Terminals Installed Over Curbs - Phase II. Federal Highway Administration (U.S.), 2001, Report no. TRP-03-105-00, ROSA P. https://rosap.ntl.bts.gov/view/dot/41762.
A barrier system was developed for installation where W-beam is placed over curbs. The guardrail design was constructed with two 2.66-mm (12-gauge) thick nested W-beam rails totaling 26.67 m in length. The nested W-beam rail was supported by fifteen W152 x 13.4 steel posts, each measuring 1,830 mm long. Post spacings were 1.905 mm on center. The concrete curb was a type "G" curb that measured 203 mm wide x 102 mm high x 19.05 m long. The research study included full-scale vehicle crash testing, using a 3/4-ton pickup truck. The full-scale test, impacting at a speed of 100.3 km/hr and an angle of 28.6 deg, was conducted and reported in accordance with the requirements specified in NCHRP Report No. 350, "Recommended Procedures for the Safety Performance Evaluation of Highway Features." The safety performance of the guardrail/curb combination barrier system was determined to be acceptable according to the Test Level 3 (TL-3) evaluation criteria specified in NCHRP Report No. 350.
Poivka, K. A., Sicking, R. K., Rohde, J. R., Reid, J. D., & Holloway, J. C. (2001). Guardrail and Guardrail Terminals Installed Over Curbs - Phase II (Report No. TRP-03-105-00). Federal Highway Administration (U.S.). https://rosap.ntl.bts.gov/view/dot/41762
Poivka, K. A., R. K. Sicking, J. R. Rohde, J. D. Reid, and J. C. Holloway. Guardrail and Guardrail Terminals Installed Over Curbs - Phase II. Report no. TRP-03-105-00. Federal Highway Administration (U.S.), 2001. https://rosap.ntl.bts.gov/view/dot/41762.
Poivka, K. A., et al. Guardrail and Guardrail Terminals Installed Over Curbs - Phase II. Federal Highway Administration (U.S.), 2001, Report no. TRP-03-105-00, ROSA P. https://rosap.ntl.bts.gov/view/dot/41762.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.