New Hampshire: Route 3A Bridge Over the Newfound River, Bristol
-
2000-08-01
Details
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The HPC bridge is a simple-span structure, 18.3 m (60 ft) long. The bridge consists of two travel lanes, shoulders, and one sidewalk. The bridge superstructure is 12.0 m (39.5 ft) wide and consists of four New England Bulb-Tee (NEBT) prestressed concrete girders spaced 3.5 m (11.5 ft) on center, with a 229-mm- (9-in-) thick deck. The NEBT girder section, which was recently developed for the region as a new economical section, incorporates the use of HPC and 15-mm- (0.6-in-) diameter low-relaxation prestressing strands. The bridge deck consists of 89-mm- (3.5-in-) thick precast prestressed deck panels overlaid with 140 mm (5.5 in) of castin-place HPC concrete. Conventional concrete, 28 MPa (4000 psi), was used in the at-grade approach slabs for comparison purposes.
-
Format:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:fb844e20345ce07e5971f67a2bb6b920c2b8abece78ee8a1a85ea822833b405991b6617fa472531b0fee63cfdf443356ee62196664b673a59a8e7162417e7644
-
Download URL:
-
File Type: