Alexiadis, V. (2008). Integrated corridor management analysis, modeling, and simulation results for the test corridor (Report No. FHWA-JPO-09-001). United States. Department of Transportation. https://rosap.ntl.bts.gov/view/dot/3995
Alexiadis, Vassili. Integrated corridor management analysis, modeling, and simulation results for the test corridor. Report no. FHWA-JPO-09-001. United States. Department of Transportation, 2008. https://rosap.ntl.bts.gov/view/dot/3995.
Alexiadis, Vassili Integrated corridor management analysis, modeling, and simulation results for the test corridor. United States. Department of Transportation, 2008, Report no. FHWA-JPO-09-001, ROSA P. https://rosap.ntl.bts.gov/view/dot/3995.
Details
Alternative Title:
Integrated corridor management analysis results for the test corridor
This report documents the Integrated Corridor Management (ICM) Analysis Modeling and Simulation (AMS) tools and strategies used on a Test Corridor, presents results and lessons-learned, and documents the relative capability of AMS to support benefit-cost assessment for the successful implementation of ICM. The analysis took into account both recurrent and nonrecurrent corridor operational conditions; key ICM impacts may be lost if only “normal” travel conditions are considered. Performance measures used in the analysis include mobility, reliability, safety, emissions, fuel consumption, and benefit-cost. To the extent possible, the measures were reported by mode, facility type, and jurisdiction. ICM strategies analyzed include highway traveler information, transit traveler information, freeway ramp metering, HOT lane, arterial traffic signal coordination, and combinations of these strategies.
Alexiadis, V. (2008). Integrated corridor management analysis, modeling, and simulation results for the test corridor (Report No. FHWA-JPO-09-001). United States. Department of Transportation. https://rosap.ntl.bts.gov/view/dot/3995
Alexiadis, Vassili. Integrated corridor management analysis, modeling, and simulation results for the test corridor. Report no. FHWA-JPO-09-001. United States. Department of Transportation, 2008. https://rosap.ntl.bts.gov/view/dot/3995.
Alexiadis, Vassili Integrated corridor management analysis, modeling, and simulation results for the test corridor. United States. Department of Transportation, 2008, Report no. FHWA-JPO-09-001, ROSA P. https://rosap.ntl.bts.gov/view/dot/3995.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.