Hornyak, N. J., Crovetti, J. A., Newman, D. E., & Schabelski, J. P. (2007). Perpetual Pavement Instrumentation for the Marquette Interchange Project - Phase 1 Final Report (Report No. WHRP 07-11). Wisconsin Highway Research Program. https://rosap.ntl.bts.gov/view/dot/39309
Hornyak, Nicholas J., James A. Crovetti, David E. Newman, and J. P. Schabelski. Perpetual Pavement Instrumentation for the Marquette Interchange Project - Phase 1 Final Report. Report no. WHRP 07-11. Wisconsin Highway Research Program, 2007. https://rosap.ntl.bts.gov/view/dot/39309.
Hornyak, Nicholas J., et al. Perpetual Pavement Instrumentation for the Marquette Interchange Project - Phase 1 Final Report. Wisconsin Highway Research Program, 2007, Report no. WHRP 07-11, ROSA P. https://rosap.ntl.bts.gov/view/dot/39309.
This report provides details on the design, installation and monitoring of a pavement instrumentation system for the analysis of load-induced stresses and strains within a perpetual HMA pavement system. The HMA pavement was constructed as part of an urban highway improvement project in the City of Milwaukee, Wisconsin. The outer wheel path of the outside lane was instrumented with asphalt strain sensors, base and subgrade pressure sensors, subgrade moisture and temperature sensors, HMA layer temperature sensors, traffic wander strips and a weigh in motion system. Environmental sensors for air temperature, wind speed and solar radiation are also included. The system captures the pavement response from each axle loading and transmits the data through a wireless link to a resident database at Marquette University. The collected data will be used to estimate the fatigue life of the perpetual HMA pavement and to modify, as necessary, pavement design procedures used within the State of Wisconsin.
Hornyak, N. J., Crovetti, J. A., Newman, D. E., & Schabelski, J. P. (2007). Perpetual Pavement Instrumentation for the Marquette Interchange Project - Phase 1 Final Report (Report No. WHRP 07-11). Wisconsin Highway Research Program. https://rosap.ntl.bts.gov/view/dot/39309
Hornyak, Nicholas J., James A. Crovetti, David E. Newman, and J. P. Schabelski. Perpetual Pavement Instrumentation for the Marquette Interchange Project - Phase 1 Final Report. Report no. WHRP 07-11. Wisconsin Highway Research Program, 2007. https://rosap.ntl.bts.gov/view/dot/39309.
Hornyak, Nicholas J., et al. Perpetual Pavement Instrumentation for the Marquette Interchange Project - Phase 1 Final Report. Wisconsin Highway Research Program, 2007, Report no. WHRP 07-11, ROSA P. https://rosap.ntl.bts.gov/view/dot/39309.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.