Battelle Memorial Institute, & BRW Inc. (2001). Thurston Region Public Transportation System Architecture and Strategic Deployment Plan: Technical Memorandum #3 (Report No. FHWA-JPO-04-046). Battelle Memorial Institute. https://rosap.ntl.bts.gov/view/dot/3907
Battelle Memorial Institute and BRW Inc.. Thurston Region Public Transportation System Architecture and Strategic Deployment Plan: Technical Memorandum #3. Report no. FHWA-JPO-04-046. Battelle Memorial Institute, 2001. https://rosap.ntl.bts.gov/view/dot/3907.
Battelle Memorial Institute, et al. Thurston Region Public Transportation System Architecture and Strategic Deployment Plan: Technical Memorandum #3. Battelle Memorial Institute, 2001, Report no. FHWA-JPO-04-046, ROSA P. https://rosap.ntl.bts.gov/view/dot/3907.
This document is the third in a series of five that present the sequential results of the Thurston Regional Planning Council (TRPC) – Regional Intelligent Transportation Systems (ITS) Planning Project. This document presents an ITS Strategic Deployment Plan for Intercity Transit (“Intercity”), the general public transit provider for Thurston County. The plan identifies a specific, three phased set of investments estimated at $6.3M that will implement many of the Intercity related components contained in the broader, regional multi-modal transportation technology vision that has been articulated for the Thurston Region—this regional vision, or architecture, is presented and documented in Tech Memo #2. This vision is referred to as ”system architecture”, and identifies the various transportation technology areas to be implemented and the interrelationships among those components.
Battelle Memorial Institute, & BRW Inc. (2001). Thurston Region Public Transportation System Architecture and Strategic Deployment Plan: Technical Memorandum #3 (Report No. FHWA-JPO-04-046). Battelle Memorial Institute. https://rosap.ntl.bts.gov/view/dot/3907
Battelle Memorial Institute and BRW Inc.. Thurston Region Public Transportation System Architecture and Strategic Deployment Plan: Technical Memorandum #3. Report no. FHWA-JPO-04-046. Battelle Memorial Institute, 2001. https://rosap.ntl.bts.gov/view/dot/3907.
Battelle Memorial Institute, et al. Thurston Region Public Transportation System Architecture and Strategic Deployment Plan: Technical Memorandum #3. Battelle Memorial Institute, 2001, Report no. FHWA-JPO-04-046, ROSA P. https://rosap.ntl.bts.gov/view/dot/3907.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.