FHWA Project R05 IAP Funded Project Case Study: Madison Beltline Precast Concrete Pavement Demonstration Project
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

FHWA Project R05 IAP Funded Project Case Study: Madison Beltline Precast Concrete Pavement Demonstration Project

Filetype[PDF-1.51 MB]


  • English

  • Details:

    • Contributors:
    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Contracting Officer:
    • Abstract:
      The production use of precast concrete pavement (PCP) has come a long way over the last 15 years. The technology is gaining wider acceptance in the U.S. for rapid repair and rehabilitation of concrete pavements as well as for heavily trafficked asphalt concrete pavements and intersections. Several U.S. highway agencies have implemented the PCP technology, and other agencies have constructed demonstration projects. In the U.S., the PCP technology is being used for intermittent repairs (full-depth joint repairs or full panel replacement) and for continuous applications (longer length/wider area rehabilitation) with service life expectations of at least 20 years for intermittent repairs and at least 40 years for continuous applications, without significant future corrective treatment. The Strategic Highway Research Program 2 (SHRP2) Project R05 was conducted from 2008 to 2012 to develop technical information and guidelines that would encourage the rapid and successful adoption of PCP technology. In 2013, the SHRP2 Implementation Assistance Program (IAP) was created to help State highway agencies, metropolitan planning organizations, and other interested organizations deploy SHRP2-developed products order to deliver more efficient, cost-effective solutions to meet complex challenges. On March 28, 2014, as part of round 3 of the IAP, four lead adopters were selected to receive financial support from the Federal Highway Administration for implementation of PCP technology. Wisconsin Department of Transportation, one of the agencies selected as a lead adopter, received an award of $300,000 to help offset the cost of the implementation of PCP technology in the State. This case study report provides details of the 2014 PCP use for repair of distressed concrete pavement along sections of the Madison Beltline Highway (MBH/US 12).
    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26