Computer-Aided Dispatch–Traffic Management Center Field Operational Test Final Evaluation Plan: State of Utah [2003]
-
2003-09-22
Details
-
Alternative Title:CAD¿TMC field operational test final evaluation plan
-
Corporate Creators:
-
Contributors:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This document presents the Evaluation Team’s plan for conducting the evaluation of the FOT in the state of Utah. A companion document exists for the evaluation of the Washington deployment. This plan includes the experimental design for testing hypotheses at one of the FOT sites. It also includes a detailed discussion of goals and objectives; a work break down structure (WBS); description of the evaluation management structure and schedule; and high-level outlines of deliverables’ content. It also contains a discussion of the target audiences for the report and includes a proposed report distribution list.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:1c5149ca89db8901363fc6e460ee284a59eaa563fa2e73642d25cd35e9eb6a3646c0615bf6c30dde158568da88df1fd3b3bf36fb7d618870ebb1a70dc7ad4ead
-
Download URL:
-
File Type: