TravelWorks Integrated Models: Final Report
-
2018-06-01
-
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final report; June 2018
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:SHRP2 provided implementation assistance to four pilots and one lead adopter to explore advanced integrated travel models. The four C10 pilots aimed to evaluate integrated activity-based travel demand models (ABM) and dynamic traffic assignment (DTA) models. These models have a fine-grained time and space resolution, and thus can be used to address pricing, management, and operations strategies for both highways and transit. The C04 lead adopter incorporated reliability and pricing into an existing planning model. This report summarizes the activities and results for the four C10 projects.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: