The Ability of a Land Ferry System to Alleviate the Increasing Costs of Maintaining the I-80 Transportation Corridor : An Economic Assessment
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.
i

The Ability of a Land Ferry System to Alleviate the Increasing Costs of Maintaining the I-80 Transportation Corridor : An Economic Assessment

Filetype[PDF-92.74 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed
English

Details:

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    This report presents an economic assessment of the ability of a Land Ferry system to alleviate the increasing costs of maintaining the I-80 transportation corridor in Nevada. The project starts at Fernley, Nevada and ends at Wells, Nevada for a length of approximately 320 miles. The project scope includes creating a new alignment close to the existing I-80 highway and the Union Pacific Railroad (UPR) in order to run a Land Ferry system that will help reduce truck traffic along the I-80 Transportation Corridor.

    Approximately l0 to 40 percent of the current volume in this commercial segment of I-80 is truck traffic. The alignment has proven to be vital in the decision-making process, since rail installation is very costly. To minimize the cost of the Land Ferry system, it is important to provide an alignment that uses the most effective route while limiting tunneling, excavation, and fills, since these will increase construction costs substantially. Power generation for the locomotives is another aspect that needs to be addressed carefully. The University of Nevada, Las Vegas (UNLV) has looked into four different possible sources of energy, including solar, wind, geothermal, and several forms of diesel. The most economical choice for power generation was determined to be wind energy.

    The Land Ferry system would not take business away from the existing businesses along the I-80 corridor. However, it may affect truck drivers, depending on how they are paid and taxed. On the other hand, using a Regional Input-Output Modelling System (RIMS II) model, it was estimated that the project would create over 45,788 jobs during the three-year construction period. Furthermore, the operation of the Land Ferry would create 318 permanent jobs. This report provides a benefit-cost analysis of the Land Ferry project. Using a }-year analysis period, both user and non-user benefits were quantified and compared to capital costs.

    The benefits and costs considered in this analysis include savings in travel time saving, reductions of accidents, savings in vehicle operating costs, reductions in vehicle emissions, project capital costs, and project operation and maintenance costs. Results from this analysis are summarized in Table 1.

  • Format:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at staging-dot.cdc.gov