Dye, B., Kraft, E., Mills, P., & Gransberg, D. (2014). Performance-Based Contractor Prequalification as an Alternative to Performance Bonds [Tech Brief] (Report No. FHWA-HRT-14-035). United States. Federal Highway Administration. https://rosap.ntl.bts.gov/view/dot/35944
Dye, Bill, Elizabeth Kraft, Peter Mills, and Douglas Gransberg. Performance-Based Contractor Prequalification as an Alternative to Performance Bonds [Tech Brief]. Report no. FHWA-HRT-14-035. United States. Federal Highway Administration, 2014. https://rosap.ntl.bts.gov/view/dot/35944.
Dye, Bill, et al. Performance-Based Contractor Prequalification as an Alternative to Performance Bonds [Tech Brief]. United States. Federal Highway Administration, 2014, Report no. FHWA-HRT-14-035, ROSA P. https://rosap.ntl.bts.gov/view/dot/35944.
State transportation departments must rely on private industry construction contractors to build, rehabilitate, and replace their infrastructure assets. The Federal Highway Administration (FHWA) is interested in ensuring that State transportation departments select contractors that can complete projects cost-effectively. One potential method to help select qualified contractors is to use a performance-based contractor prequalification process. FHWA commissioned this study to evaluate the wisdom of expanding the use of this process. This report presents the results of this study, which examined relevant literature, evaluated the benefits and costs of performance bonds and performance-based contractor prequalification, and recommended a model performance-based prequalification approach.
Dye, B., Kraft, E., Mills, P., & Gransberg, D. (2014). Performance-Based Contractor Prequalification as an Alternative to Performance Bonds [Tech Brief] (Report No. FHWA-HRT-14-035). United States. Federal Highway Administration. https://rosap.ntl.bts.gov/view/dot/35944
Dye, Bill, Elizabeth Kraft, Peter Mills, and Douglas Gransberg. Performance-Based Contractor Prequalification as an Alternative to Performance Bonds [Tech Brief]. Report no. FHWA-HRT-14-035. United States. Federal Highway Administration, 2014. https://rosap.ntl.bts.gov/view/dot/35944.
Dye, Bill, et al. Performance-Based Contractor Prequalification as an Alternative to Performance Bonds [Tech Brief]. United States. Federal Highway Administration, 2014, Report no. FHWA-HRT-14-035, ROSA P. https://rosap.ntl.bts.gov/view/dot/35944.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.