Report on functional requirements and software architecture for the IDTO prototype phase 2 : central Florida demonstration.
-
2015-05-01
-
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This report documents the System Requirements and Architecture for the Phase 2 implementation of the Integrated Dynamic
Transit Operations (IDTO) Prototype bundle within the Dynamic Mobility Applications (DMA) portion of the Connected Vehicle
Program. It builds off of the previous system requirements report and adds site-specific requirements.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: