This project developed a low cost building energy management system (EMS) and conducted vehicle-to-grid (V2G) experiments on a commercial office building. The V2G effort included the installation and operation of a Princeton Power System CA-30 bi-directional power system. These experiments targeted the reduction of utility peak electrical demand for a commercial office building. In each case, total building peak demand was managed through a computer algorithm to limit the charging rate of electric vehicles or used the vehicle’s on-board traction battery as a storage device to minimize peak electrical loads.
Wireless charging tests of electric vehicles (EV) have been conducted at the EVTC Wireless Laboratory located at the Florida Solar Energy Center, Coco...
Electric vehicle (EV) batteries have significantly improved since their inception. However, lifetime of these batteries is still strongly dependent on...
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.