Composite Action in Prestressed NU I-Girder Bridge Deck Systems Constructed with Bond Breakers to Facilitate Deck Removal : Technical Summary
-
2017-11-01
-
Details
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Technical Summary
-
Corporate Publisher:
-
Abstract:Results are reported from tests of small-scale push-off and large-scale composite NU I-girder specimens conducted to establish an interface connection detail that (1) Facilitates in-situ removal of the bridge deck without damaging prestressed girders, and (2) Maintains composite action between the prestressed girder and reinforced concrete deck throughout the service-life of the structure.
-
Format:
-
Collection(s):
-
Main Document Checksum:urn:sha256:3716a375d26995d1615b7e3ec080c5f983e041a4706f4b2bf8047f46e2920424
-
Download URL:
-
File Type:
Checkout our Featured at Stacks Home