Composite Action in Prestressed NU I-Girder Bridge Deck Systems Constructed with Bond Breakers to Facilitate Deck Removal : Technical Summary
-
2017-11-01
Details:
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Technical Summary
-
Corporate Publisher:
-
Abstract:Results are reported from tests of small-scale push-off and large-scale composite NU I-girder specimens conducted to establish an interface connection detail that (1) Facilitates in-situ removal of the bridge deck without damaging prestressed girders, and (2) Maintains composite action between the prestressed girder and reinforced concrete deck throughout the service-life of the structure.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
File Type:
Supporting Files
-
No Additional Files
More +