Proposal for monitoring concrete painting as a preventive maintenance tool (Abutments and pier caps).
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.
i

Proposal for monitoring concrete painting as a preventive maintenance tool (Abutments and pier caps).

Filetype[PDF-1.27 MB]


English

Details:

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • DOI:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    One of the growing number of preventive bridge maintenance activities conducted by the Kentucky Transportation Cabinet (KYTC) is washing and applying thin film protective coatings to bridge abutments and piers. Previous work conducted by Kentucky Transportation Center (KTC) under KYSPR 10-406 documented increased chloride contamination of these bridge components and the need for protective coatings. KYTC Contract ID 162952 includes, among other tasks, cleaning and coating specific concrete elements of eighteen bridges in Anderson and Woodford counties (District 7). These elements are interior faces of the barrier walls, pier caps, and abutment seats. The contract was let on July 29, 2016, with the primary completion date as July 31, 2017. There were five bids that ranged from $326,870.61 to $810,645.00 with the engineering estimate as $475,155.08. The contract was awarded to the low bidder, M&M Services Co. Inc., on August 5, 2016. For most of the project the contractor had two crews — a pressure washing crew, consisting of two foremen and six workers, and a painting crew with one foremen and six applicators. Various crew members changed at times due to other commitments of the contractor. Of the coating systems identified in KYSPR 12-433 and KYSPR 05-291 the contractor selected the PPG Amerlock 2/Devoe Devflex HP system. Most of the systems were identified by laboratory testing with limited field application. This study focused on monitoring and documenting surface preparation, coating application, and field performance to determine the potential for use on future projects and possible inclusion of the coating on a List of Approved Materials for Concrete Coatings. Six of the eighteen bridges in this contract were monitored, and critical elements in the overall process were assessed and documented. This included initial substrate condition, surface preparation, application method, applied film conditions (e.g., thickness, continuity), and weather conditions. The bridges selected for monitoring were: • Continuous Span – B00027N and B00019N • Simple Span – B00026N and B00037N • Steel Multi Span – B00007L and B00007R
  • Format:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at rosap.ntl.bts.gov