Detroit Corridor Evaluation Plan
-
1998
Details
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:THE GOALS OF THIS PROJECT ARE TO (1) MEASURE THE IMPACTS FROM INSTALLING THE EXISTING ITS FACILITIES, (2) DETERMINE WHETHER MOTORISTS' EXHIBIT A BIAS TOWARD FREEWAYS, (3) CALCULATE THE IMPACT OF FREEWAY BIAS, (3) IDENTIFY OPERATIONAL STRATEGIES THAT IMPROVE CORRIDOR THROUGHPUT, AND (5) EVALUATE THE REAL-WORLD IMPACT OF THE PROPOSED STRATEGIES. A TWO-PHASE METHODOLOGY OF SIMULATION AND FIELD EVALUATION IS PROPOSED TO MEET PROJECT GOALS. FIRST, A SIMULATION EVALUATION WILL QUANTIFY CURRENT ITS IMPACTS. THIS IS NOT FEASIBLE THROUGH A
FIELD TEST AS RELEVANT PRE-ITS DATA IS UNAVAILABLE. SIMULATION ALSO PROVIDES AN OPPORTUNITY TO ?GAME OUT? AND FINE-TUNE ITS STRATEGIES. PROVIDED THAT IN SIMULATION ITS OPERATIONAL STRATEGIES IMPROVE PERFORMANCE, MDOT, THE ITS JPO, AND MITRETEK SYSTEMS WILL SELECT A SUBSET OF THE STRATEGIES FOR FIELD IMPLEMENTATION. MITRETEK EXPECTS TO GENERATE FIELD-MEASURED IMPACTS BY
DEPLOYING AND SUBSEQUENTLY MONITORING THE SIMULATION-SUCCESSFUL STRATEGIES.
-
Format:
-
Collection(s):
-
Main Document Checksum:urn:sha256:22dfeaef54a151b5e2c0e801721bc04d159e73fe7329500245da14a0b2cb4b90
-
Download URL:
-
File Type: