U.S. flag An official website of the United States government.
Official websites use .gov

A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS

A lock ( ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

i

A synthesis study on collecting, managing, and sharing road construction asset data.

File Language:
English


Filetype [PDF - 14.86 MB]

Details

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • DOI:
  • Resource Type:
  • Geographical Coverage:
  • Edition:
    Final report
  • Corporate Publisher:
  • Abstract:
    Accurate and complete construction records and as‐built data are the key prerequisites to the effective management of transportation ; infrastructure assets throughout their life cycle. The construction phase is the best time to collect such data. Assets such as underground ; drainage and culverts are visible and physically accessible only during construction. For assets such as guardrails, signals, and pavement, ; it is safer and more efficient to collect data during construction than after construction when the road segment is open to traffic.   ; The purpose of this project was to conduct a synthesis study to 1) assess the current status at INDOT regarding the collection of asset ; data during the construction phase and the use of such data in the operation and maintenance (O&M) phase, and 2) develop a ; framework for INDOT to leverage the construction inspection and documentation process to collect data for assets. Data needs during ; O&M were identified through rounds of meetings with relevant INDOT business units. The current practice in construction ; documentation was investigated in detail. A survey of state highway agencies (SHAs) was conducted to assess the state‐of‐the‐practice. ; A practical framework was developed to leverage the construction inspection and documentation practice to collect asset data that are ; needed in O&M. The framework uses specific pay items—construction activities that result in physical structures—as the bridge to ; connect plan assets (i.e. physical structures specified in the design documents) to their corresponding counterparts in the asset ; management systems. The framework is composed of 1) a data needs component for determining the information requirements from ; the O&M perspective, 2) a construction documentation module, and 3) a mapping mechanism to link data items to be collected during ; the construction documentation to data items in the asset management systems. The mapping mechanism was tested and validated ; using four priority asset classes—underdrains, guardrails, attenuators, and small culverts—from an INDOT construction project. The ; testing results show that the newly developed framework is viable and solid to collect asset data during the construction phase for O&M ; use in the future, without adding extra workload to construction crews. The framework can reduce/eliminate the duplicate data ; collection efforts at INDOT, leading to savings and efficiency gains in the long term.
  • Format:
    PDF
  • Funding:
  • Download URL:
  • File Type:
    Filetype[PDF - 14.86 MB]
  • Collection(s):
  • Main Document Checksum:
    urn:sha-512:29ded617c03785f795ada3ea4c70fd15d732d2c876ce429cd3be846816564b2c51b879ce2dd14ee378d7cbef38fbe6eba5bf972ec5b7824727a9a9eca3261ab7
File Language:
English
ON THIS PAGE
 Found an issue?
Send us an email at:
ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.