Cut-and-Cover Tunneling: Final Report Volume 3
-
1976-01-01
Details:
-
Alternative Title:Summary Cost Analyses Volume 3
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report July 1974-June 1978
-
Corporate Publisher:
-
Abstract:This volume contains summary cost analyses for 15 of the 176 study situations. The analysts give the unit costs of all labor, equipment, and material resources required to complete each project and are typical of the 176 cost estimates prepared for this study.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: