Taylor, W. C., & Abdel-Rahim, A. S. (1998). Analysis of corridor delay under SCATS control : FAST-TRAC Phase III deliverable (Report No. EECS-ITS LAB-FT-083). Michigan State University. https://rosap.ntl.bts.gov/view/dot/2967
Taylor, William C. and Ahmed Shawky Abdel-Rahim. Analysis of corridor delay under SCATS control : FAST-TRAC Phase III deliverable. Report no. EECS-ITS LAB-FT-083. Michigan State University, 1998. https://rosap.ntl.bts.gov/view/dot/2967.
Taylor, William C., and Ahmed Shawky Abdel-Rahim Analysis of corridor delay under SCATS control : FAST-TRAC Phase III deliverable. Michigan State University, 1998, Report no. EECS-ITS LAB-FT-083, ROSA P. https://rosap.ntl.bts.gov/view/dot/2967.
Details
Alternative Title:
Final report on analysis of corridor delay under SCATS adaptive control system (Orchard Lake Road Corridor)
NTL-INTELLIGENT TRANSPORTATION SYSTEMS-Freeway Management
;
NTL-OPERATIONS AND TRAFFIC CONTROLS-Traffic Flow
Abstract:
The study was designed to determine the change in travel time following the implementation of the Sydney Coordinated Adaptive Traffic System (SCATS) in Oakland County, Michigan. A before/after comparison was used to examine the change in travel time on a specific corridor (Orchard Lake Road). The results of the study showed that corridor travel-time and intersection delay for the main street through traffic improved as a result of SCATS implementation. The corridor travel-time improved for both directions for both the peak and the non-peak periods. The reduction in corridor travel time ranged from 6.56% to 31.80%, with savings in travel time being higher during the non-peak periods.
Taylor, W. C., & Abdel-Rahim, A. S. (1998). Analysis of corridor delay under SCATS control : FAST-TRAC Phase III deliverable (Report No. EECS-ITS LAB-FT-083). Michigan State University. https://rosap.ntl.bts.gov/view/dot/2967
Taylor, William C. and Ahmed Shawky Abdel-Rahim. Analysis of corridor delay under SCATS control : FAST-TRAC Phase III deliverable. Report no. EECS-ITS LAB-FT-083. Michigan State University, 1998. https://rosap.ntl.bts.gov/view/dot/2967.
Taylor, William C., and Ahmed Shawky Abdel-Rahim Analysis of corridor delay under SCATS control : FAST-TRAC Phase III deliverable. Michigan State University, 1998, Report no. EECS-ITS LAB-FT-083, ROSA P. https://rosap.ntl.bts.gov/view/dot/2967.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.