Performance of bridge approach panels in Wisconsin : [brief].
-
2015-05-01
Details
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:Several years ago, the Wisconsin Department of Transportation changed the bridge
approach slab design from a system with one expansion joint to a system that
now has three expansion joints. The reason for this change was to protect both
the pavement and the bridge from differential expansion and contractions.
-
Format:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:8f2bd85cfa8eeef2c38b6107b4afd3757800d284471aa537370b347ad40d7e0e29d368c7fdc2b3fd0a21f232e282ab99b3999547a5d91150814d0093f66cdaea
-
Download URL:
-
File Type: