Evaluation of curing compound application time on concrete surface durability : [brief].
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Add terms to the query box

Query box

Help
Clear All
i

Evaluation of curing compound application time on concrete surface durability : [brief].

Filetype[PDF-216.43 KB]


  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      Roadways that are both durable and aesthetically pleasing are primary goals of Wisconsin Department of Transportation (WisDOT) paving projects. Recently, Portland Cement Concrete (PCC) pavement projects constructed by WisDOT have experienced increased amounts of scaling within the first two years of service life. Scaling is a form of surface damage that can lead to decreases in the aesthetic appeal, functionality and service life of a PCC pavement. Scaled pavements typically demonstrate symptoms including surface roughness, exposed aggregates, collection of loose scaled material on the surface and discontinuities in both the outward appearance and level of the top layer of the pavement. Membrane-forming curing compounds (MFCCs) are used in paving applications to properly ensure that the mix water within the mortar that comprises the top ¼ to ½ inch of the concrete pavement surface does not prematurely evaporate and inhibit hydration. However, pavement projects using any one of several different WisDOT-approved curing compounds still experienced scaling within a few years of construction.
    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.18