Enhancements to highway construction scheduling expert system.
-
2015-05-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This research was performed to enhance the software tool (Illinois Construction Scheduling Expert ; System, ICSES) developed in Phase I of this project (ICT project R27-86) by mining data collected on ; IDOT construction projects and differentiating production rates based on project type and size, and training ; for IDOT engineers on effective use of the expert system tool. The researchers obtained Illinois ; COnstruction Record System (ICORS) data from each district and assembled a statewide database of ; more than 4,000 projects completed from 2003-2014. Rich production rate data was extracted from the ; ICORS files by analyzing the resident engineers’ daily diaries and other historical records and processing ; this data for use in the ICSES software. The results of the data analysis give the scheduler templates of a ; variety of highway construction projects with the controlling items associated with those projects and the ; order in which the activities typically occur. The ICSES software was updated based on the results of the ; analysis of the ICORS data. Templates were modified and/or added in the existing Excel-based database. ; Production rates currently given in the Construction Daily Production Rate table (Bureau of Design and ; Environment Manual, Table 66-2.B) were updated based on analyses of data generated by the research. ; Users of ICSES are given information to assist in development of a schedule and engineers’ estimate of ; time based on project parameters.
-
Format:
-
Funding:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha256:1d45f4dd113d94746dcfc4ffc902ca280a2a0e80afea4843e3a137a62cdae2c2