This project had two main objectives. The first was to improve the safety of transit workers, specifically right-of-way safety for rail transit workers through demonstration of advanced track inspection techniques that limit the inspector’s exposure to rail right-of-way by visually inspecting the condition of the tracks from a safe location. The second objective was to enhance the quality of inspection by the use of objective, high-quality video systems capable of recording detailed images of the track and its main components at train speeds, coupled and synchronized with the use of multiple measuring systems installed onboard a Track Inspection Car. This report describes the use of those systems under a Pilot Project performed by MTA-NYCT using its TGC4 car on a segment of the Flushing Line (#7 Train) in New York City and includes a discussion of the results and benefits found by the use of the video and measuring systems together.
This report describes the demonstration of an innovative system to reduce the hazards of working in the track environment. It describes the deployment...
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.