Welcome to ROSA P |
Stacks Logo
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.
 
 
Help
Clear All Simple Search
Advanced Search
Jetting and flooding of granular backfill materials : [summary].
  • Published Date:
    2015-03-01
  • Language:
    English
Filetype[PDF-551.03 KB]


Details:
  • Creators:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Abstract:
    Granular backfill materials on highway projects are often compacted by mechanical methods. This requires the contractor to place backfill material into loose lifts of varying thickness and use compaction equipment to reduce air voids and increase material density until the required compaction is achieved. Under the appropriate conditions, alternative methods to traditional compaction are hydraulic jetting or flooding. Jetting inserts a probe into the backfill layer and emits a high pressure jet of water, saturating the material from the bottom-up. Flooding, or compaction by drainage, completely saturates an area and material from the top of the fill downward. Slurry flooding involves a mixer “pouring” a slurry mix of granular backfill material and water as the fill layer and allowing it to drain. All three hydraulic methods use residual suction upon drainage to increase the effective stress and move grains into a more compact arrangement.
  • Format:
  • Main Document Checksum:
  • Supporting Files:
    No Additional Files
No Related Documents.
You May Also Like: