Connecticut permanent long-term bridge monitoring network, volume 2 : monitoring of curved post-tensioned concrete box-girder bridge : I-384 WB over I-84 in East Hartford (bridge #5686).
-
2014-08-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This report describes the instrumentation and data acquisition for a three-span continuous, curved post-tensioned box-girder ; bridge in Connecticut. The computer-based remote monitoring system was developed to collect information on the deformations, ; accelerations and temperature distributions to evaluate the long-term behavior and performance of the bridge. The monitoring ; system was installed in 1999, as the first system in a long-term research project to evaluate a variety of bridges in Connecticut. ; The data collected over multi-year periods from normal vehicular traffic has been used to learn about long-term performance of ; this bridge, resulting in a series of papers. The initial study developed an approach using histograms to better define natural ; frequencies from the extensive field data. The second study explored the influence of temperature distributions on the overall ; behavior of the bridge, including evaluation of the cause of cracking in both the box girders and the interior column supports. The ; third study looked at the influence of temperature variations on the baseline data, needed to remove the effect of temperature ; variations from data generated for long-term structural health monitoring. The final study has used the information previously ; developed for both this bridge and others to establish a baseline for long-term structural health monitoring and performance ; evaluation to determine if changes in the structural integrity are developing over time. The final study described in this report ; identifies and quantifies different data qualification measures needed for the structural health monitoring of this bridge.
-
Format:
-
Funding:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha256:e434cbee8611d28b2b54a9aa0d0f080c95c5974dac82b81fa95dba50d2314a98