Data collected on TPAD implementation projects.
-
2014-11-01
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:TPAD testing was conducted by CTR personnel at the following locations during TxDOT Project
5-6005-01: Statewide Implementation of Total Pavement Acceptance Device (TPAD) (January
2013 through August 2014):
(1) San Marcos Airport,
(2) IH 10 in El Paso (two tests conducted at this site),
(3) US 75 in Sherman,
(4) IH 27 in Lubbock and Amarillo,
(5) US 287 in Quanah,
(6) US 287 in Childress, and
(7) SH 288 in Houston.
Pertinent data are provided in Figure 1 through Figure 96.
-