Jonsson, J. A., Olek, J., Ramirez, J. A., Scholer, C. F., & Peterman, R. J. (2012). High Performance Concrete (HPC) bridge project for SR 43 (Report No. FHWA/IN/JTRP-2012/17). Indiana. Dept. of Transportation. https://rosap.ntl.bts.gov/view/dot/26273
Jonsson, Jon A., Jan Olek, Julio A. Ramirez, Charles F. Scholer, and Robert J. Peterman. High Performance Concrete (HPC) bridge project for SR 43. Report no. FHWA/IN/JTRP-2012/17. Indiana. Dept. of Transportation, 2012. https://rosap.ntl.bts.gov/view/dot/26273.
Jonsson, Jon A., et al. High Performance Concrete (HPC) bridge project for SR 43. Indiana. Dept. of Transportation, 2012, Report no. FHWA/IN/JTRP-2012/17, ROSA P. https://rosap.ntl.bts.gov/view/dot/26273.
NTL-HIGHWAY/ROAD TRANSPORTATION-Bridges and Structures
;
NTL-HIGHWAY/ROAD TRANSPORTATION-Construction and Maintenance
;
NTL-HIGHWAY/ROAD TRANSPORTATION-Materials
Abstract:
The objective of this research was to develop and test high performance concrete mixtures, made of locally available materials, having
;
durability characteristics that far exceed those of conventional concrete mixtures. Based on the results from the development of high
;
performance concrete, guidelines for a high performance concrete bridge over Burnett Creek on SR 43, just north of I‐65 near West
;
Lafayette, Indiana, will be prepared. In addition, the effects of different curing conditions, with respect to temperature and moisture
;
conditions, were evaluated. The use of 15.2 mm (0.6 in) prestressing strand in girders made of 69 MPa (10 ksi) concrete was also
;
evaluated with respect to pullout resistance and transfer and development lengths.
Jonsson, J. A., Olek, J., Ramirez, J. A., Scholer, C. F., & Peterman, R. J. (2012). High Performance Concrete (HPC) bridge project for SR 43 (Report No. FHWA/IN/JTRP-2012/17). Indiana. Dept. of Transportation. https://rosap.ntl.bts.gov/view/dot/26273
Jonsson, Jon A., Jan Olek, Julio A. Ramirez, Charles F. Scholer, and Robert J. Peterman. High Performance Concrete (HPC) bridge project for SR 43. Report no. FHWA/IN/JTRP-2012/17. Indiana. Dept. of Transportation, 2012. https://rosap.ntl.bts.gov/view/dot/26273.
Jonsson, Jon A., et al. High Performance Concrete (HPC) bridge project for SR 43. Indiana. Dept. of Transportation, 2012, Report no. FHWA/IN/JTRP-2012/17, ROSA P. https://rosap.ntl.bts.gov/view/dot/26273.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.