Details:
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
NTL Classification:NTL-HIGHWAY/ROAD TRANSPORTATION-Bridges and Structures;NTL-HIGHWAY/ROAD TRANSPORTATION-Construction and Maintenance;
-
Abstract:The Florida Department of Transportation (FDOT)
maintains more than 6,500 bridges. Considering
the expense of repair and replacement of bridges,
extending their durability and service life is
important. Of special concern for bridges in
marine settings is corrosion of steel reinforcing
rods or prestressing cables resulting from chloride
ions migrating through concrete. The cost of
corrosion nationally has been estimated at $276
billion per year.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
File Type:
Supporting Files
-
No Additional Files
More +