How can innovative project delivery systems improve the overall efficiency of GDOT in transportation project delivery?
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

How can innovative project delivery systems improve the overall efficiency of GDOT in transportation project delivery?

Filetype[PDF-5.51 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed
English

Details:

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    The USDOT and Federal Highway Administration (FHWA) recommend the smart use of innovative project

    delivery systems, such as design-build, to improve efficiency and effectiveness of developing transportation

    projects. Although design-build provides state DOTs with accelerated delivery and innovations in design and

    construction, there is still a need to accelerate delivery of design-build projects and achieve higher level of

    efficiency. To fully utilize the entire potential benefits of the design-build project delivery system, state DOTs are

    required to overcome significant challenges in various critical areas of the project development process including

    project delivery system selection, procurement, environmental analysis and permitting, right-of-way (ROW)

    acquisition, utilities coordination and relocation, alternative technical concepts (ATCs), and design oversight,

    design acceptance, and quality management. The overall objective of this research project is to develop a

    guidebook for the Georgia DOT (GDOT) to identify major challenges in the critical areas of the project

    development process, determine opportunities to overcome these challenges, and describe potential best practices

    to enhance the efficiency of project development process for highway design-build projects. The findings of

    design-build review and scanning process, and the results of interviewing design-build programs in 7 state DOTs

    helped the research team identify various issues related to efficient delivery of design-build projects in the seven

    critical areas. The primary findings of this study are categorized under these critical areas. Each area begins with

    clear description of the new dynamics of design-build and follows with critical challenges and issues to enhance

    the efficiency of delivery processes. These challenges relate to a variety of legal and statutory barriers or issues

    that can delay the project delivery schedule, increase the project delivery cost, and hinder flexibility of the designbuild team to implement innovative design and construction solutions. Furthermore, the analysis for each area

    presents efficiency enhancement opportunities as a set of propositions that recommend appropriate strategies for

    implementation. Examples of actual design-build projects are provided along with references from project

    RFQs/RFPs, design-build guides and manuals, and professional and academic literature for further clarification of

    challenges that can happen during development of design-build projects and strategies to overcome the challenges.

  • Format:
  • Funding:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at rosap.ntl.bts.gov