Development of a test facility to evaluate the optimal design of BMPs for managing environmental problems at construction sites.
-
2012-06-01
Details:
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
NTL Classification:NTL-ENERGY AND ENVIRONMENT-ENERGY AND ENVIRONMENT ; NTL-HIGHWAY/ROAD TRANSPORTATION-Construction and Maintenance ;
-
Abstract:The following document is the final report for ALDOT Project 930‐655 which summarizes the design and construction of the Auburn University – Erosion and Sediment Control Testing Facility (AU‐ESCTF) along with several intermediate‐scale, full‐scale, and field‐scale research efforts performed during the project period. This report contains separate design briefs and research briefs providing an overall summary of the individual efforts conducted under this research project. Each brief is intended to be read as a separate document, and this final report is the compilation of all design and research briefs developed as a result of this research effort. The complete details and results associated with each research element are fully documented in the master’s theses reference at the conclusion of this section.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
File Type:
Supporting Files
-
No Additional Files
More +