Investigating causes and determine repair needs to mitigate falling concrete from bridge decks.
-
2012-09-01
Details
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This study developed a procedure to identify concrete bridge decks that are exhibiting the characteristics associated ; with falling concrete. Field exploratory work on reinforced concrete bridge decks was supported by analytical and ; laboratory investigations. The field work included visual inspection, non-destructive tests, and sampling of full-depth ; cores and powder samples from the bottom of the bridge deck. Chief variables assessed were the chance of corrosion ; by the half-cell potential, chloride content at the location of the bottom reinforcement, and the concrete pH level. The ; chloride diffusivity was estimated from the chloride profile. The laboratory investigation was performed on bridge ; deck beams. The beams were constructed from concrete containing chloride levels known to cause corrosion as well as ; from a control concrete. Beams were subjected to freeze-thaw or saltwater followed by repeated loading to simulate ; field conditions. The following characteristics were quantified: chance of corrosion, corrosion rate, chloride content, ; flexural response as a function of environmental exposure and repeated loads, and ultimate strength. The size of the ; porous zone around the reinforcement was determined using an environmental scanning electron microscope. Finally, a ; strategy was developed to assess if a bridge deck exhibited the characteristics associated with falling concrete. The ; strategy included visual inspection of cracking and spalling, assessment of chance of corrosion, chloride content, and ; pH levels. If any of these measures exceed critical levels a service life calculation needs to be performed. Based on ; existing mathematical models, the time to corrosion initiation and time to corrosion cracking can be predicted. The ; resulting time is then compared to the age of the bridge. From this information proper planning for future repair needs ; can be made.
-
Format:
-
Funding:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:6dfcaf596c88bc81a414b35472533b77d5f93f15b8d7048b76526c014d25f2e5aaa741a277d0d1eb09064c03bba2ba895b9c9249751d1b2f777a21032703b475