Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:Past construction methods have resulted in the need for leveling
wedges of asphaltic cement concrete or mud jacking at locations where a
reinforced concrete box culvert was replaced with a pipe culvert .
With the restraint of limited funds, more reconstruction, restoration,
repair and resurfacing (4R) projects will be constructed. This will
result in using existing pavements with trench replacement of small box
culverts.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
File Type:
Supporting Files
-
No Additional Files
More +