Port sedimentation solutions for the Tennessee-Tombigbee Waterway in Mississippi report 1 : preliminary evaluation.
-
2002-11-01
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:Sedimentation of the navigation channel and ports on the Tennessee-Tombigbee
Waterway has averaged over 800,000 yd3 per year since completion of the Waterway.
The standard solution for the past 17 years has been to dredge the accumulated
sediment and place it in upland confined disposal sites. That solution has become less
effective as dredging costs have risen and dredging contracts have become more
difficult to obtain.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: