Construction and testing of crumb rubber modified hot mix asphalt pavement.
-
1999-12-01
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final report.
-
Corporate Publisher:
-
Abstract:This research project was structured toward addressing that portion of ISTEA which directs the individual states to conduct studies on the recyclability of crumb rubber modified
(CRM) hot mix asphalt (HMA) and the technical performance of CRMHMA pavement. These objectives were addressed by monitoring the construction of highway test sections in
which CRMHMA was incorporated into the pavement structure, evaluating the performance of these sections and then cold milling and recycling this pavement material into new
HMA through a hot mix asphalt plant. This project was constructed in two phases in which the CRMHMA pavement was built in the first phase and approximately two years later
milled and used as RAP in the surface course during the second phase. This report covers both phases of the construction.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: