Precast concrete elements for accelerated bridge construction : laboratory testing, field testing, evaluation of a precast concrete bridge, Madison County bridge.
-
2009-01-01
-
Details:
-
Alternative Title:Volume 2 : Laboratory testing, field testing, and evaluation of a precast concrete bridge : Madison County bridge
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final report.
-
Corporate Publisher:
-
Abstract:The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa
DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed in 2007 over
a stream. The bridge’s precast elements included precast cap beams and precast box girders. Precast element fabrication and bridge
construction were observed, two precast box girders were tested in the laboratory, and the completed bridge was field tested in 2007 and
2008.
-