Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Connection details for prefabricated bridge elements and systems.

Filetype[PDF-31.99 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed
  • English

  • Details:

    • Corporate Creators:
    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • OCLC Number:
      769464411
    • Edition:
      Final document.
    • NTL Classification:
      NTL-HIGHWAY/ROAD TRANSPORTATION-Bridges and Structures;NTL-HIGHWAY/ROAD TRANSPORTATION-Design;NTL-HIGHWAY/ROAD TRANSPORTATION-Construction and Maintenance;
    • Abstract:
      Prefabricated components of a bridge produced off-site can be assembled quickly, and can reduce design time and cost,

      minimizing forming, minimize lane closure time and/or possibly eliminate the need for a temporary bridge. This document has

      been developed to promote the use of prefabricated elements and systems in bridges and focuses on "Connection Details" as

      part of accelerated construction projects. Accelerated Bridge Construction is one of the prime focus areas of the Office of

      Infrastructure of Federal Highway Administration. It focuses on a need to create awareness, inform, educate, train, assist and

      entice State DOT’s and their staff in the use of rapid construction techniques. This document represents the “State of the

      Practice” at this time with respect to connections between prefabricated elements in accelerated bridge construction projects.

      Most of the details were obtained from State Departments of Transportation, industry organizations, and private consultants.

      This information contained herein should be used to develop designs and determine which details would be appropriate for

      accelerating bridge construction projects.

    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26