Cost effectiveness of the MDOT preventive maintenance program.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Cost effectiveness of the MDOT preventive maintenance program.

Filetype[PDF-2.15 MB]


  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • NTL Classification:
      NTL-HIGHWAY/ROAD TRANSPORTATION-Pavement Management and Performance;NTL-HIGHWAY/ROAD TRANSPORTATION-Construction and Maintenance;
    • Abstract:
      The Michigan Department of Transportation’s (MDOT) pavement preservation program dates back to 1992. MDOT’s pavement preservation strategy is primarily implemented through its capital preventive maintenance (CPM) program, in which preventive maintenance treatments are used to protect existing pavement surfaces, slow deterioration, and correct surface deficiencies. An overall objective of the CPM program is to postpone major rehabilitation and reconstruction activities by extending the service life of pavements.

      This study evaluated the benefits and costs of various preventive maintenance treatments used in MDOT’s CPM program. Defining the benefit as the percent increase in performance over a “do nothing” or untreated pavement performance curve, where data were available benefits were calculated for preventive maintenance treatments. Using unit costs, benefit-cost ratios were calculated, permitting the comparison of the cost-effectiveness of similar treatments. The overall performance of MDOT’s CPM program was also examined by comparing the life-cycle costs (LCC) of a rehabilitation strategy to a preservation strategy using a simplified approach. The outcome showed that the preservation strategy results in agency cost savings of approximately 25 percent per lane-mile over the rehabilitation strategy.

      Findings from this study can be used to help MDOT improve its CPM project selection, treatment selection, and performance monitoring and modeling practices.

    • Format:
    • Funding:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26