Abstract:Construction of the South Slough (Charleston) Bridge was completed in March of 1991. The structure was constructed with prestressed concrete beams using grit-impregnated, epoxy coated prestressing strands. While epoxy coated reinforcing steel has been used successfully to combat corrosion for several years, epoxy coating for prestressing strands is a relatively new application. The use of epoxy coated strands did not cause any significant construction problems. The strands and concrete mix were bonded well. The bonding characteristics of the grit-impregnated epoxy prestressed strands to the concrete will be monitored for two years, until March 1993, to detect any loss in bonding.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha256:58973623f41bd7fb0fbed2aeb67cbe3dbe5fd0532def1eb6285e2e8d1994a378
-
Download URL:
-
File Type: