Evaluation of grit-impregnated, epoxy coated prestressing strand on South Slough (Charleston) Bridge : construction report.
-
1991-12-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:Construction of the South Slough (Charleston) Bridge was completed in March of 1991. The structure was constructed with prestressed concrete beams using grit-impregnated, epoxy coated prestressing strands. While epoxy coated reinforcing steel has been used successfully to combat corrosion for several years, epoxy coating for prestressing strands is a relatively new application. The use of epoxy coated strands did not cause any significant construction problems. The strands and concrete mix were bonded well. The bonding characteristics of the grit-impregnated epoxy prestressed strands to the concrete will be monitored for two years, until March 1993, to detect any loss in bonding.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:46ff2c1260dac98ed572439c2e595528b166b9fea194bf1ff8e27f5f13b8d730bb9fded7ef4fddc24d6d6168817548cf11a178945fb7ece572e19cc8aa52e332
-
Download URL:
-
File Type: