Development of an improved overlay design procedure for Oregon : vol. I, interim report, background and framework.
-
1986-12-01
-
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This report is the first in a three-volume series dealing with the development of an improved overlay design procedure for Oregon. This report presents the results of the first-year findings and includes: (1) a detailed review of the literature; (2) the development of the framework for an improved procedure; and (3) an evaluation of data from three projects using several procedures including the proposed AASHTO procedures (NDT methods 1 and 2). The results of this report indicated the following: (1) the AASHTO procedures have several advantages over the presently used ODOT procedure; (2) the major limitation of the AASHTO procedure is lack of reliable backcalculation procedures (NDT method 1); and (3) NDT method 2 appears to work well for low-volume roads and should be tested on high-volume roads.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:ea8d1d3822c6d83662a254a7a0644ce9344c4a67d7cd3f97d73f13568c82913e8dc28978e4743ec12c5add6ab4c661fb921ebbc302df632890faed55606f9e78
-
Download URL:
-
File Type: