Development of an improved overlay design procedure for Oregon : vol. I, interim report, background and framework.
-
1986-12-01
-
-
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This report is the first in a three-volume series dealing with the development of an improved overlay design procedure for Oregon. This report presents the results of the first-year findings and includes: (1) a detailed review of the literature; (2) the development of the framework for an improved procedure; and (3) an evaluation of data from three projects using several procedures including the proposed AASHTO procedures (NDT methods 1 and 2). The results of this report indicated the following: (1) the AASHTO procedures have several advantages over the presently used ODOT procedure; (2) the major limitation of the AASHTO procedure is lack of reliable backcalculation procedures (NDT method 1); and (3) NDT method 2 appears to work well for low-volume roads and should be tested on high-volume roads.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha256:3cca9f02fd51a17638cc894d9a3419b06f4f41ec37727c1bd95a04341d3c791a
-
Download URL:
-
File Type:
Checkout our Featured at Stacks Home