Performance evaluation of buried pipe installation : LTRC research project capsule 08–6GT.
-
2008-03-01
Details:
-
Alternative Title:LTRC research project capsule 08¿6GT.
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Edition:LTRC research project capsule 08-6GT.
-
Corporate Publisher:
-
Abstract:The Louisiana Department of
Transportation and Development
(LADOTD) is in the process of revising
the current specifications to obtain a
more cost efficient design and
installation of buried pipes for highway
infrastructure. It aims to develop a
process of alternate bidding and
alternate construction for buried pipe
installation so the construction budget
can be wisely used. Therefore, having a
better understanding of the soilstructure
interaction (SSI) among
bedding, backfill, fill cover, and pipes of
different materials (concrete, metal,
plastic, etc.) and mechanical properties
will be beneficial.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: