Surface recycling Route US 71 : construction and initial evaluation.
-
1986-08-01
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:Recently in Louisiana due to monetary constraints, typical overlay section design has been modified from a levelling and wearing course (3.5 inches) to cold milling (average 2 inch depth) and 1.5-2.0 inches of wearing course. Due to the five years of satisfactory performance, it was decided to once again examine surface recycling as an economic alternative. The U.S. 71 project was selected as a typical overlay project which could provide representative results. This report details the construction phase and initial evaluation of this surface recycling project.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
File Type:
Supporting Files
-
No Additional Files
More +